Greenside Mine - Greenside Mine

Greenside Mine
Отвалы и бывшие шахтные постройки у реки Сварт Бек
Место бывшей шахты Гринсайд
Место расположения
Рудник Гринсайд находился к западу от Алсуотера.
Шахта Гринсайд находилась к западу от Алсуотера.
Greenside Mine
Расположение в Камбрии
Место расположенияGlenridding
округКамбрия
СтранаАнглия
Координаты54 ° 32′53 ″ с.ш. 2 ° 59′02 ″ з.д. / 54,548 ° с. Ш. 2,984 ° з. / 54.548; -2.984Координаты: 54 ° 32′53 ″ с.ш. 2 ° 59′02 ″ з.д. / 54,548 ° с. Ш. 2,984 ° з. / 54.548; -2.984
Производство
Товарысвинец, серебро
Производство156000 тонн
ТипПод землей
История
Открытв течение 1700-х годов
Закрыто1962

Greenside Mine (иногда называют Свинцовая шахта Гринсайд) был успешным вести мой в Озерный район Англии. С 1825 по 1961 год на руднике было добыто 156000 длинных тонн (159000 тонн) вести и 1 600 000 унций (45 тонн) серебро,[1] примерно от 2 миллионов тонн руда.[примечание 1] В 1940-х годах он был крупнейшим производителем свинцовой руды в Великобритании. Что необычно для рудника 19-го века в Великобритании, есть очень полные записи о его деятельности, начиная с 1825 года.[5]

Рудник, вероятно, открылся во второй половине 1700-х годов, но закрылся к 1819 году. В 1825 году была образована компания Greenside Mining Company, которая вновь открыла рудник. Они получали хорошую прибыль до 1880 года, когда цена на свинец упала. Многие другие свинцовые рудники были закрыты в то время, но компания сократила свои расходы и продолжала работать в Greenside до 1935 года. Электроэнергия была введена в шахту в 1890-х годах, и она стала первым рудником в Великобритании, где использовались электродвигатели с электродвигателями и электродвигателями. локомотив. В 1936 году компания Basinghall Mining Syndicate Ltd. приобрела рудник и превратила его в крупного производителя свинца. Шахта закрылась в 1962 году после исчерпания запасов свинца. Незадолго до закрытия шахта использовалась Центр исследования атомного оружия (AWRE) провести эксперимент по обнаружению сейсмических сигналов от подземных взрывов. Пятнадцать лет после закрытия шахты шахтёры стали посещать верхние уровни. Они очистили входы и несколько обрушились на крышах, и сегодня они могут пройти через шахту, используя старый путь эвакуации.

Вся руда, добываемая на руднике, поступала из жилы Гринсайд, минеральная жила который заполнил геологический разлом в направлении с севера на юг через восточный гребень Зеленая сторона, гора в Диапазон Helvellyn. Горнодобывающая промышленность проследила этот разлом на протяженности 3900 футов (1200 м) и до глубины 2900 футов (880 м). Четыре области вены, известные как рудные побеги, содержащий галенит, руда свинца, которая также содержала небольшое количество серебра. Сначала руду добывали просто на машине штольни в горный склон. Чтобы получить доступ к руде на больших глубинах, два более длинных уровня были пробиты снизу, но дальше, а затем последовала серия валы были затоплены в шахте. Самая низкая точка шахты находилась примерно на 100 м ниже уровня моря, где окружающие андезит рок опирался на нижележащий сланцы в котором разлом не минерализовался.

Были построены две обогатительные фабрики для измельчения руды и отделения от нее галенита, а у рудника была собственная плавильный завод между 1828 и 1917 годами, но после этого было более экономично продавать концентрированный галенит коммерческому плавильному предприятию. Машины в руднике и мельницах питались от обильного водоснабжения в этом районе, использовались для привода водяных колес и гидравлических двигателей, а после 1890 г. гидроэлектроэнергия. Десятки тележек доставляли припасы в отдаленные районы шахты и вывозили их. В начале 1900-х годов шахта открыла собственный бизнес по автоперевозкам, используя два паровозы.

Люди, работавшие на шахте в 19 веке, приехали из обширных областей, и многие из них каждую неделю останавливались в жилых помещениях (ночлежках), построенных на шахте. Со временем компания построила десятки домов в Glenridding и в «Редком виденном» в Гленкойндейле, где также была построена школа. Горнодобывающие работы выполнялись группами мужчин, которые заключали контракты на выполнение определенных работ, и получали оплату за их результаты. Тем, кто работал по вывозу руды из рудника или переработке руды, платили по недельной ставке. Закрытие шахты привело к значительной потере рабочих мест в этом районе.

Местоположение

Расположение шахты Гринсайд возле Гленриддинга

Шахта была к западу от Glenridding деревня, которая находится на южной оконечности Ullswater в приходе Паттердейл. Это сейчас в Камбрия, но во время работы шахты она находилась в бывшем уезде Westmorland. Над деревней находится долина, в которой находится Гленриддинг-Бек, вытекающая из источников в Ред-Тарн и Браун-Коув. Более высокая боковая долина на севере лежит между горами Зеленая сторона и Поднимать. Именно над этой боковой долиной было найдено месторождение свинца, проходящее через восточный гребень Грин-Сайда на высоте около 2000 футов (600 м) над уровнем моря.[2]

В 18 веке это месторождение разрабатывалось с уровней, врезанных прямо в гору, над верхней долиной. Позже уровни были подняты на депозит снизу вниз, но более далеко. К концу 19-го века основной доступ к шахте был с уровня Люси Tongue Level, который был забит почти со дна Swart Beck. Заводы по переработке и плавке руды находились в том же месте, в 1,4 мили (2,3 км) вверх по долине над деревней Гленриддинг.

Электроэнергия для работающего оборудования в шахте и мельницах бралась из ручья ниже Грин-Сайд и из Гленриддинг-Бека. Было построено несколько плотин, чтобы регулировать поток воды в этих ручьях, а естественные водоемы в Ред-Тарне и в Кеппель-Коув были расширены. После 1890 года вода из ручьев использовалась для производства электроэнергии, и в итоге были построены три небольшие электростанции. Небольшой ручей также был направлен в шахту через уровень Гленкойн в 1850-х годах для привода гидравлического оборудования.

Рудное месторождение

Топография территории вокруг Greenside Mine с указанием геологических дамб и разломов

Вся продукция Greenside Mine была произведена с одного минеральная жила, которые заполнили ориентированный с севера на юг вина проходит через восточный гребень Зеленая сторона гора.

Зеленая сторона состоит из андезит рок, часть Borrowdale Volcanic Group, сформированный в Ордовик Период, примерно 450 миллионов лет назад.[6] Это опирается на сланцы из старшего Skiddaw Group, которые были обнаружены на самых нижних уровнях шахты. Маленький дамба из порфировидный микрогранит[заметка 2] имеющий в плане "собачью лапу"[7] вторгся в эти скалы во время Девонский Период;[6] это сформировало плоскость слабости, которая контролировала положение разлома.[7]

Ошибка Гринсайда - это нормальная ошибка со средним окунать 70 ° в.д. Плоскость разлома не является плоской поверхностью, и фактическое падение разлома Гринсайд варьируется от 58 ° к востоку до вертикали; в одном месте это было 83 ° з.д.[8] Поскольку порода раскололась, и две стороны двигались друг против друга, образовались полости, частично заполненные битой породой (разломная брекчия и воронка ). Гидротермальный циркуляция морской воды при температуре 110–130 ° C, вероятно, во время Каменноугольный Период, приведший к минерализации полостей разломов. Считается, что содержание металла было выщелочено из пород группы Скиддо или из нижележащих гранитов. батолит.[9] Минерализация разлома имеет некоторую вертикальную зональность с барит (сульфат бария) в верхней части жилы,[заметка 3] и небольшое количество как обманки (сфалерит, сульфид цинка) и халькопирит (сульфид меди-железа) на более глубоких уровнях.[10]

Руда из жилы Гринсайд, содержащая барит (белый), галенит (серый) и кварц (бледно-коричневый). Пенни имеет диаметр 20,3 мм.

В серебристый галенит (сульфид свинца, содержащий небольшое количество серебра), который искали горняки, имел форму выступов, нитей и рассеянных карманов по всей жилой.[4] Многие струны галенита, варьирующиеся по толщине от 1/8 дюйма (2 мм) до примерно трех дюймов (76 мм), были вкраплены в жилу, а иногда и распространялись в скале на восточной стороне жилы ( подвесная стена вины).[11] Минерализованные части жилы в основном были обнаружены в четырех областях, известных как "рудные побеги. »Их положение определялось крутизной плоскости разлома. В целом области, где падение разлома составляло более 70 °, были минерализованы, а там, где падение было менее 70 °, жила была бесплодной.[8] заполнена брекчией с мягкими разломами светлого цвета, которую горняки назвали «глыба».[12] Минерализованные части жилы, по крайней мере, в нижней части рудника, имели среднее содержание свинца 7%.[13]

Ширина жилы варьировалась от долей дюйма до 30 футов (9,1 м) и более. Бесплодные участки обычно имели ширину от 5 до 7 футов (от 1,5 до 2,1 м);[10] обработанные площади варьировались от 6 футов (1,8 м) до 40 или 50 футов (12 или 15 м).[14][примечание 4] В верхней части шахты, где струны свинца пробивались сквозь висящую стену, иногда стоило вырезать отверстие шириной от 30 до 60 футов (от 9,1 до 18,3 м),[11] но в нижних выработках в 1950-е гг. ширина забоев в среднем составляла 6 футов (1,8 м).[2] Две ответвительные жилы возникли в связи с дайкой микрогранитов. На более высоких уровнях жила разделялась и проходила по обе стороны дамбы. На большей глубине, где жила находилась в андезите к западу от дайки, была обнаружена Восточная ветвь, контактирующая с дайкой.[10]

На своем южном конце жила заканчивалась, когда приближалась к глиняной жиле с востока на запад, разделяясь на несколько небольших стрингеров,[16] описывается как «структура хвоща».[10] Все попытки найти жилу к югу от глиняной жилы не увенчались успехом. Северный конец жилы так и не был определен,[10] но все поиски свинца за пределами самого северного рудного вала (около 3600 футов (1100 м) от южного конца) также были безуспешными. Протяженность жилы по вертикали была прослежена и проработана от вершины Грин Сайд вниз до верхней границы Группы Скиддо на расстоянии 2600 футов (790 м).[10] Хотя свинцовые жилы были обнаружены в породах группы Скиддо в других местах Озерного края, пласты на Грин-Сайде были неблагоприятными для минерализации;[14] Таким образом, эти пласты отмечали дно шахты.

Горное дело до 1820 г.

Диаграмма 1890 года, показывающая склон горы, линию впадающей на восток жилы и четыре уровня старых шахт.

Неизвестно, когда была впервые обнаружена жила Гринсайд или когда там началась добыча полезных ископаемых, но объем горных работ, выполненных до 1820 года, предполагает дату во второй половине 1700-х годов.[17][2]

В Паттердейл на протяжении 18 века. Договор аренды на право добычи на руднике Хартсоп Холл датирован 1696 годом;[18] то приходские книги зарегистрированы захоронения «промывателя руды» в 1713 г. и горняка из г. Дербишир в 1754 г .;[19] а перепись в Паттердейле в 1787 г. было зарегистрировано 16 горняков из 165 мужчин.[20] и писатель в 1789 году говорил о социальных изменениях «около тридцати лет назад», вызванных наплывом горняков, когда «в долине было добыто несколько свинцовых рудников».[21] Тем не менее, нет ничего, что связывало бы какие-либо из этих ссылок с Greenside.

В. Т. Шоу утверждал, что Гринсайд к 1690 году работал «группой голландских авантюристов» (вероятно, имея в виду немецких горняков),[22] но не привел никаких доказательств этого и, возможно, имел в виду другие шахты в округе. Дэвид Гоф утверждал, что «первое документальное свидетельство добычи полезных ископаемых на Гринсайде» датируется 1784 годом, но также не смог сказать, что это за свидетельство.[23] Сэмюэл Мерфи обнаружил то, что он считал «первым документальным свидетельством», в виде записки адвоката от 1799 года, в которой говорилось о мистере Томпсоне, который работал на шахте в Гринсайде при герцоге Норфолкском.[24] Мерфи также нашел ссылку на Гринсайд в путеводителе Уильяма Грина 1819 года. Говорят, что шахты находились «рядом с дорогой из Кесвика в Паттердейл» и «до недавнего времени работали Уильямом Шеффилдом. Esquire, "минеральный агент герцогу Девонширскому.[25][примечание 5] Упомянутая дорога явно пересекается Палки проходят, который проходит мимо старых выработок в Гринсайде.

Вертикальный разрез рудника Гринсайд был нарисован горным инженером-консультантом в 1853 году. На нем показаны три старых уровня доступа над двумя уровнями, которые использовались в то время, и большие площади остановился (отработанный) грунт.[26] У. Т. Шоу подсчитал, что старые уровни, известные как верхний уровень, средний уровень и уровень Гилговера, проходили на глубине 40 саженей (73 м; 240 футов), 60 саженей (110 м; 360 футов) и 85 саженей (155 м; 510 футов). футов) ниже вершины хребта.[12][примечание 6] Сэмюэл Мерфи подсчитал, что три уровня были на 659 метров выше. боеприпасы (AOD), 631 метр AOD и 581 метр AOD.[26] Эти три старых уровня подразумевают, что до того, как Уильям Шеффилд оставил шахту, незадолго до 1819 года было выполнено много горных работ. Кроме того, в этот ранний период использовался четвертый старый уровень («Уровень тишины», см. Ниже), и пятый уровень (позже известный как «Высокий уровень» или «Высокий уровень лошади») был начат до того, как шахта была заброшена.[17]

Жила Гринсайд могла быть обнаружена среди скал на вершине Гленкойна, где она обнажения и это видно. Одна ветвь жилки была частично срезана на обнажении, а колокольня известный как Duke's Sump[примечание 7] был потоплен на другом ответвлении "в какой-то момент".[27] Был ли обнаружен свинец, неизвестно. Жила также могла быть обнаружена высоко на южной стороне Грин-Сайда. Склон холма покрыт толстым слоем ледникового покрова. валунная глина, скрывая из виду богатую свинцовую жилу.[28] Однако естественный овраг пересекал жилу высоко (недалеко от того места, где сегодня находится основание самого высокого из провалов), и в овраге могли быть найдены куски руды.[26] Дальше по склону холма замолчать был использован, чтобы выявить положение жилы, выпуская плотину вверх по течению, чтобы смыть валунную глину.[28]

Исследование поверхностных структур на руднике Гринсайд в начале 1990-х годов не обнаружило никаких признаков верхнего уровня. На среднем уровне он обнаружил неглубокую выемку поверхности на глубине 627 метров AOD, отверстие в месте обрушения крыши уровня, небольшую кучу мусора и крутой склон. санки Отсюда идет трек, спускающийся по склону холма. Остатки кузница были обнаружены ниже, у основания среднего провала обрушения, где была ровная площадка на 584 метра AOD с фундаментом здания и россыпью угля, кокса, шлака и железа. Уровень Гилгауэра был идентифицирован с отвалом мусора и входной выемкой на 582 метрах AOD. Ниже этого было свидетельство другого уровня, проложенного на высоте 572 метра AOD. С каменными стенами входной выемкой и большой грудой мусора это выглядело как главный уровень, и его забили со дна разведочной тишины, упомянутой выше. Этот уровень не был показан на плане шахты 1853 года, и Мерфи назвал его уровнем тишины. От его устья бежал мелководный канал, который, казалось, осушал шахту в течение значительного времени.[29] Раннее Обследование боеприпасов карта местности, карта Вестморленда 1861 года в масштабе 1: 2,500, показывает два уровня шахты, соответствующие Уровню Гилговера и Уровню Тишины. Оба имеют пометку «Старая шахта», что означает, что они больше не использовались на тот момент.[30]

После того, как руда была извлечена из шахты, ее необходимо было отделить от горных пород и других жильных минералов (порода ). Исследование поверхности показало свидетельства раннего одевание Этаж рядом с болотом на дне долины, на 550 метрах AOD, где небольшой ручей служил небольшим источником воды. В этом районе было найдено много обломков сильно выветренного галенита. Также выяснилось, что промывные воды позже были перенесены в другое место рядом с болотом, где можно было обеспечить более надежное водоснабжение. А кожа собрал воду из первоначального ручья, находившегося на высоте 36 метров над старой уборной, и направил ее в несколько небольших водохранилищ дальше на восток, которые могли собирать и из других источников. Однако место новой мойки пола было разрушено более поздним зданием шахты.[31] После того, как руда была обогащена, ее забрали вьючные лошади Пройдите через Палки на плавильный завод в Стоникрофте в долине Ньюлендс, недалеко от Кесвика.[17][22]

Деловые вопросы

Синдикат Greenside Mining был сформирован «ближе к концу 18 века» по У. Т. Шоу.[22] Источник этой информации неизвестен, но Сэмюэл Мерфи думал, что этот синдикат «вероятно, был компанией Уильяма Шеффилда».[32]

1825-1880 гг.

Джордж Хед Хед в 1840 г., основной акционер Greenside Mining Company с 1835 по 1876 г.

Компания Greenside Mining был основан в 1820-х годах для открытия и работы заброшенной шахты. За этим предприятием стояли четыре местных бизнесмена во главе с Томасом Кантом, успешным бакалейщиком из соседнего городка Penrith. Они взяли рудник под свой контроль в начале 1825 года, как сообщает Вестморлендская газета 26 марта 1825 г.[33] Первоначально были наняты четыре горняка, а горные работы контролировались агентом по добыче полезных ископаемых.[34]

Два местных землевладельца[примечание 8] потребовал права на недропользование участка, где располагалась шахта. К счастью, в декабре 1826 года они пришли к полюбовному соглашению, по которому им было предоставлено совместное владение определенной территорией вокруг рудника и равными долями владения. роялти из продукции шахты. Затем они предоставили четырнадцатилетний арендовать новой компании 31 мая 1827 года в обмен на 1/9 стоимости плавленого свинца, а на следующий день, 1 июня 1827 года, партнерство соглашение подписали десять акционеры в компании.[36]

Томас Кант умер в 1831 году. Изменения в акционерном капитале в течение следующих нескольких лет передали контроль над компанией новой группе людей. Основным акционером был Джордж Хед Хед, а Квакер банкир из Карлайл К 1835 г. владел 18 из 64 акций.[37] В 1832 году был назначен новый агент по добыче полезных ископаемых, и горные работы были значительно расширены, и к 1834 году было занято 90 человек. Для доступа к руде ниже нынешнего уровня рудника требовались крупные инвестиции, но это означало переход на новый уровень в бесплодной земле. на сотни ярдов. Чтобы обезопасить свои инвестиции, компания договорилась о продлении их аренды на четырнадцать лет (в 1835 году), что дало им гарантии до 1862 года.[38]

В 1853 году компания снова обратилась за продлением аренды. Они снова планировали новый, еще более низкий уровень для разработки запасов руды на большей глубине рудника, а для этого потребовались бы годы работы. На этот раз помещики воспользовались возможностью внести некоторые изменения в условия аренды. Уильям Маршалл, в частности, критиковал отсутствие у компании инженерных знаний и плохое долгосрочное планирование. Ключевым условием нового договора аренды было назначение независимого инженера-консультанта в качестве агента по добыче полезных ископаемых, оплачиваемого компанией, но назначаемого совместно землевладельцами и компанией. Другие положения были направлены на смягчение некоторых неудобств, вызванных действующей шахтой в этом районе, от загрязнения реки и озера до состояния дорог и чистоты жилых помещений для рабочих.[39]

За пятьдесят лет до 1876 года Гринсайд произвел около 60 000 длинных тонн (61 000 тонн) руды, из которых было получено 40 000 длинных тонн (41 000 тонн) свинца на сумму 800 000 фунтов стерлингов и 600 000 унций (17 тонн) серебра на сумму 150 000 фунтов стерлингов. Прибыль 300000 фунтов стерлингов[примечание 9] был разделен между акционерами.[41]

1880-1920 гг.

Плохие экономические условия 1880-х годов, часть мирового экономического спада, известного как долгая депрессия, создала финансовые трудности для шахты. Цена свинца упала на 50% и достигла минимальной отметки в 10,69 фунтов стерлингов.[примечание 10] за тонну в 1884 г. в результате крупномасштабного импорта дешевого иностранного свинца. В течение семи лет с 1881 по 1887 год акционерам не выплачивались дивиденды, а в 1884 году акционерам было предъявлено требование о выплате 25 фунтов стерлингов за акцию.[примечание 11] в первый раз это было необходимо. Даже гонорары, причитающиеся землевладельцам, не могли быть выплачены в 1884 году. Долг был перенесен и погашен в течение следующих десяти лет. Роялти фактически потребляли 69% рабочей прибыли рудника в течение десятилетия с 1880 по 1890 год, поскольку они были основаны на количестве произведенного свинца. Это произошло несмотря на новый договор аренды, который снизил роялти до 1/12 части произведенного свинца, подписанный 16 ноября 1883 года.[42]

Одновременно произошли изменения среди акционеров рудника. Джордж Хед Хед умер в 1876 году и Майлз Макиннес, его приемный наследник, стал основным акционером. Два других крупных акционера умерли в 1882 году. Макиннес был разочарован перспективами рудника и продал все свои акции в 1884 году после того, как им потребовалось 25 фунтов стерлингов. Но новые директора во главе с Робертом Брэдшоу Смитом и Джоном Паттинсоном начали увеличивать производство и сокращать расходы. В то время, когда многие британские свинцовые рудники закрывались, эти люди решили решить финансовые проблемы и сохранить рудник в рабочем состоянии. Рудник вернулся к рентабельности и снова начал выплачивать дивиденды в финансовый год 1888/89.[43]

Компания Greenside Mining Company Ltd. была создана в октябре 1889 года, чтобы дать акционерам защиту ограниченная ответственность в это непростое время. Старая компания была ликвидирована; аренда и другие активы были проданы новой компании за 61 440 фунтов стерлингов.[примечание 12][примечание 13] Сто двадцать акций новой компании были распределены на каждую из шестидесяти четырех акций старой компании.[44]

Одним из первых действий новой компании было использование опытного горного инженера в качестве главного агента по добыче полезных ископаемых. Капитан В. Х. Борлас[примечание 14] был завербован за умение управлять шахтами в сложных условиях. Его подход заключался в том, чтобы работать на руднике как можно более экономично за счет снижения затрат на рабочую силу при сохранении или повышении производительности. Он сделал это, внедрив на рудник последние технические инновации, такие как электроэнергия и оборудование.[45]

Новый 21-летний договор аренды был заключен в 1901 году, и для того, чтобы справиться с изменяющимися рыночными условиями, роялти были установлены по шкале, которая зависела от цены на свинец, от 1/30, когда она была ниже 10 фунтов стерлингов за тонну, до 1/10, когда она была ниже 10 фунтов стерлингов за тонну. цена была выше 17 фунтов за тонну.[46]

Первая Мировая Война в 1914–1918 годах увеличился спрос на свинец и рыночная цена, но добыча на руднике упала в результате трех факторов: плохой руды, нехватки горняков и двух очень засушливых летних месяцев, которые серьезно снизили водоснабжение электростанции. жилой дом. К 1918 году добыча упала до 600 тонн в год, а существенные работы по освоению запасов руды еще не проводились.[47] В 1919 году начались переговоры о продлении срока аренды, и компания, осознавая свое тяжелое финансовое положение, потребовала уменьшения суммы гонорара. Но помещики[примечание 15] и их советники отклонили все предложения компании. В результате компания вошла в добровольная ликвидация в ноябре 1920 г.[48]

1920 по 1935 год

Попытки продать рудник или его активы ни к чему не привели. В конце концов капитан Борласе, вышедший на пенсию в 1919 году, предложил старым акционерам новые инвестиции и согласовал новые условия с землевладельцами. Акционеры согласились на реконструкция компании, выделившей четыре новых фунта стерлингов обыкновенные акции за каждую из 7680 старых акций и выпуская 4280 привилегированные акции собрать деньги, необходимые для разработки рудника.[примечание 16] Новый 1923 год Greenside Mining Company Ltd. возникла, и землевладельцы договорились о фиксированной арендной плате в размере 225 фунтов стерлингов в год в течение пяти лет с уменьшенной ставкой гонорара, выплачиваемой сверх арендной платы после этого времени.[49]

Рудник вернулся к рентабельности в 1920-е годы.[50] но столкнулся с рядом трудностей, а затем с падением цен на свинец в 1930-х годах. Плотина водохранилища обрушилась в 1927 году, вызвав катастрофическое наводнение через деревню Гленриддинг. К счастью, никто не погиб, но иски о компенсации обошлись компании в более чем 4500 фунтов стерлингов, то есть прибыли за несколько лет.[51] Замещающая плотина водохранилища, построенная примерно за 11 000 фунтов стерлингов, также разрушилась в августе 1931 года, и водохранилище было заброшено.[52] В том же месяце одна из шахт рухнула, а в декабре 1933 года снова обрушилась.[53] Падение цен на свинец привело к сокращению числа сотрудников с 68 до 53 в феврале 1931 года и до 40 в июле 1932 года.[54]

В председатель из компании, Дж. В. Паттинсон, умер в апреле 1931 г., проработав председателем в течение 24 лет. Его заменил Дж. К. Кидд, еще один давний директор и зять капитана Борлас. Он внимательно проанализировал снижение прибыльности компании и пришел к выводу, что цена на свинец была слишком низкой. Операции постепенно сокращались, и за год по март 1933 года был нанесен убыток в размере 1635 фунтов стерлингов.[55] Доказанные запасы руды продолжали расти, но компания не могла профинансировать разработку нового участка. Зная, что рудник можно сделать прибыльным, управляющий предпринял последнюю попытку в феврале 1934 г. совет директоров чтобы вложить достаточно капитала, чтобы сделать Greenside крупным производителем. По его отчету не было предпринято никаких действий, и компания начала ликвидация в марте 1935 г.[56]

1936 по 1962 год

British Metal Corporation (BMC) участвовала в эксплуатации крупного свинцового рудника в Северном Уэльсе недалеко от г. Пентре Халкин, но запасы свинца там подходили к концу, и когда рудник Гринсайд закрылся, BMC уже искала возможное новое предприятие. В 1936 году BMC вместе с дочерней компанией Associated Lead Manufactures Ltd. основали Basinghall Mining Syndicate Ltd.[примечание 17] изучить возможность покупки Greenside, полагая, что она потерпела неудачу только из-за отсутствия рабочий капитал.

Тем не менее, компания хотела быть уверенной в том, что Greenside Mine содержит достаточные запасы руды для проведения крупномасштабных горных работ, которые сделают ее прибыльной. Предложили взять двухлетний вариант на руднике, во время которого они отремонтируют собственность и докажут ее ресурсы, выплачивая землевладельцам мертвую ренту в размере 90 фунтов стерлингов в год. Многие условия старых договоров аренды они отвергли как неподходящие для крупной современной горнодобывающей компании. Они предложили фиксированный платеж роялти в размере 1/40 (5%) от стоимости свинцовых концентратов, аргументируя это тем, что, если бы рудник работал в достаточно большом масштабе, эти роялти были бы вполне удовлетворительными для землевладельцев.[57]

Немедленно был начат срочный ремонт шахты, особенно двух подземных стволов, и доктор У. Р. Джонс из Королевская горная школа изучили запасы руды и перспективы рудника. Его предварительный отчет был положительным, и компания начала крупномасштабную программу отбора химических проб, которая также дала хорошие результаты. Повышение цены на свинец в конце 1936 года также улучшило перспективы рудника.[58] Компания решила приобрести рудник у ликвидаторов в июле 1937 года.[примечание 18][59]

В течение следующих двух лет была проделана большая работа по подготовке рудника и наземных сооружений к высокопроизводительной трех-сдвиг работающий. К сентябрю 1939 года две материнские компании инвестировали 160 000 фунтов стерлингов в акционерный капитал и 57 000 фунтов стерлингов в виде ссуд для финансирования предприятия, а также компании баланс показал убыток в размере 79 712 фунтов стерлингов после крупных понесенных расходов.[60] Но к 1940 году Greenside Mine стала крупнейшим производителем свинцовой руды в Соединенном Королевстве. В 1941 году на руднике работало более 220 человек, когда объем производства составил более 5000 тонн свинца в год. Однако это не сразу привело к прибыли из-за высоких затрат на разработку, и операционные убытки продолжались до 1941 года.[61]

Вторая Мировая Война началось в 1939 году, как раз тогда, когда началась масштабная разработка рудника. Свинец был важным национальным товаром, и в военное время Министерство снабжения хотела захватить рудник и получить всю свинцовую продукцию. В июле 1942 г. был заключен контракт, по которому министерство оплатило эксплуатационные расходы шахты, все утвержденные опытно-конструкторские работы и все необходимые установки или оборудование. Компания продолжала управлять рудником от имени Министерства, и вместо прибыли было выплачено 30 шиллинги[примечание 19] на каждую тонну сухих свинцовых концентратов. Это соглашение продлилось до конца июня 1944 года.[62]

Высокий уровень производства оказался неустойчивым. Работы по освоению новых запасов отставали от производства 6000 тонн сырой руды в месяц. В январе 1943 г. производство пришлось свернуть, и обогащение руды мельница сокращена до одной смены в день.[63] Но последовал еще больший удар. В мае 1943 года при углублении одной из шахт горняки столкнулись с полосами мягкого черного цвета. сланец. Министерство прислало команду из Канадские инженеры с алмазным буровым оборудованием, и это подтвердило, что группа пород Скиддо лежала примерно на 217 саженей (397 м) ниже главного входа в шахту (уровень Люси), а не на 300 саженях (550 м), как предсказывали геологи. Богатое богатство руды, которого ожидала компания, не было.[64]

Сразу же была предпринята программа разведки поверхности в попытке найти латеральное продолжение жилы. Склон холма был покрыт толстым слоем торфа, и ряд итальянских военнопленные были использованы, чтобы попытаться проследить выход вены. Чтобы помочь с поиском, исследование удельного электрического сопротивления была проведена ближе к концу 1943 г., и были выкопаны траншеи для исследования мест на Hart Side где были многообещающие признаки. Однако здесь были обнаружены лишь небольшие прожилки бесплодного кварца.[65] Подземные изыскания также проводились путем расширения уровней Люси и 120 морских глубин на север, но безуспешно. Тщательный обзор геологии Британская геологическая служба в феврале 1944 г. указал путь к некоторым небольшим месторождениям руды, но подтвердил, что не существует значительного расширения запасов.[66]

Когда рудник был возвращен компании в июне 1944 года, производство было сокращено, и тридцать человек были уволены. Менеджер начал планировать, как лучше всего работать на руднике, чтобы сохранить прибыль, при этом следя за тем, чтобы запасы руды не были потеряны после закрытия рудника. Было сделано все возможное, чтобы контролировать расходы и максимизировать прибыль. Но это был не тот рудник с высокой производительностью, который Basinghall Mining Syndicate видел в своей работе, и они объявили о прекращении добычи в 1946 году. Однако за период до сентября 1946 года рудник получил лучшую прибыль на сегодняшний день в размере 19 926 фунтов стерлингов.[примечание 20] Благодаря программе устойчивого развития производство оставалось неизменным, и при хорошей цене на свинец компания оставила рудник открытым.[67]

Вероятно, что Basinghall Mining Syndicate была ликвидирована в 1954 году, потому что новая компания назвала Greenside Mines Ltd. был основан в марте 1954 года для эксплуатации рудника. Наконец, в 1958 году было принято решение не финансировать дальнейшие разработки на руднике, вывести оставшуюся руду и закрыть в конце 1959 года.[68]

Незадолго до закрытия рудника компании предложили разумную плату за Центр исследования атомного оружия (AWRE) для проведения эксперимента по обнаружению сейсмических сигналов от подземных взрывов в рамках операции «Орфей».[69][примечание 21] Когда в августе 1960 года программа испытаний была завершена, контроль над шахтой вернулся к компании Greenside. К апрелю 1961 года последняя часть руды была извлечена, оборудование распродано, большая часть построек была снесена, а участок очищен. Последние двенадцать рабочих получили зарплату в январе 1962 года.[72]

Подземные выработки

В горном склоне

Ряд больших ям на склоне горы Грин-Сайд, образованных в результате обрушения старых горных выработок под ними.

Горные выработки 18 века начались с штольни загнан в пологий склон по линии жилы. Они были известны как Верхний уровень, Средний уровень и Уровень Гилгауэра. По мере того, как каждый уровень углублялся в холм, руда добывалась путем вырубки возвышенностей над уровнями или отстойников под ними. Руда обычно удалялась накладными остановка (местное название «кровля»), то есть путем срезания кровли уровня. Деревянные рабочие платформы были построены выше уровня, опираясь на тяжелые балки, вклиненные между двумя сторонами жилы. Руда сбрасывалась с забоев на уровень ниже, засыпалась в деревянные тачки и выкатывалась. Местами ширина выработок могла достигать 60 футов (18 м), где жила разделилась на две отдельные ветви или трещины на востоке были минерализованы. Эти выработки были оставлены открытыми без поддержки, и большие ямы на склоне холма сегодня показывают, где они в конечном итоге обрушились.[73][12]

Высокий уровень лошади[примечание 22] был начат до того, как шахта была заброшена в 1810-х годах,[17][12] из самой низкой возможной точки на дне верхней долины под Зеленой стороной. Его сделали достаточно широким и прямым, чтобы лошади могли тащить по нему телеги с рудой по узкоколейным деревянным рельсам. Новая компания продвинула этот уровень вперед и в 1828 году прорвалась к отстойнику (вертикальной выработке), который был построен ниже уровня Гилгауэра. Это создало естественную вентиляцию в шахте и позволило расширить работу. К 1834 г. в подполье работало 92 человека. Высокий конный уровень продолжился на север и в 1837 году пересек северную границу территории, разделяемой двумя землевладельцами.[75]

Ниже высокого уровня лошади

Чтобы добраться до руды ниже высокого уровня лошади, уровни доступа должны были проходить намного дальше, или шахты должны были быть заглублены в шахту.

Vertical section through Greenside Mine in about 1910, with the High Horse Level highlighted in yellow, the Low Horse Level and Low Level Engine Shaft in green, the Lucy Tongue Level and Lucy Engine Shaft in red, and Smith's Shaft in blue. Worked out stopes are shaded.

In 1835 a Низкий уровень (or Low Horse Level) was begun from the side of the ravine which carries the Swart Beck from the upper valley down to the lower valley of Glenridding, a point over 33 fathoms (60 m) lower than the High Level. A wooden bridge over the ravine from a narrow terrace on the west side gave access to the new level. From this point the miners had to excavate a distance of 440 yards (400 m) to reach the vein, work which took nearly six years to complete and cost around £2,500.[примечание 23] The new level was driven towards the Greenside vein by following two other soft but barren veins where possible. The vein was reached at the end of 1840, but far to the south of the higher workings, and in barren ground. Levels were driven both north and south from this point. The one to the south, known as Marshall's Level, was driven more than 100 fathoms (180 m), but no lead was found. But the level to the north discovered the South Ore Shoot, a new lead-rich part of the vein in 1844.[76][77] During the nineteenth century natural ventilation was adequate in the many interconnected levels of the mine. In blind headings a fan blast, worked by a boy, was used, or in very long drives a more powerful waterblast drove air down cast iron pipes to within a few yards of the miners at the forehead.[78]

At the same time work continued in other parts of the mine. The old Top Level was cleared out in 1842, and then driven forward. Some work was done in the old Middle Level in 1845. From 1842 to 1844 the Glencoyne Level was driven from the head of Glencoyne to explore the vein much further north, beneath the old workings known as Duke's Sump. When the vein was reached, headings were driven both north and south, and further cross-cuts made to look for other branches of the vein, but no ore was found in this area. Ore above the High Horse Level was still being worked and provided most of the mine's output.[79][80]

Первый шахта at Greenside was sunk in 1851–52 to give access to ore beneath the Low Level. Это было известно как Engine Shaft (or Willie Shaft) and was sunk from a point 360 yards (330 m) north of where the level had first reached the vein. Initially the shaft was sunk 36 fathoms (66 m) and a new 36 Fathom Level was driven from the bottom.[81][82] Два hydraulic engines were installed at the top of the shaft, one for winding and one for pumping out water.[примечание 24] The water power for running these engines came from a reservoir created in the High Horse Level. That level had been driven northwards in an unsuccessful search for ore, and its forehead was not far from the southern end of the Glencoyne Level, though about 30 feet (9.1 m) lower. The two levels were connected, the floor of the Glencoyne Level was regraded so water would run in, not out, and a small stream diverted into the mouth of the level. A dam was built across the High Horse Level, and pipes ran down to the hydraulic engines.[84][85][86] The shaft was extended to the 48 Fathom Level in 1865–66, though that level had been started in 1858 from a sump, sunk on the vein from the 36 Fathom Level.[87] Eventually, in 1880, the shaft was sunk a further 32 fathoms (59 m) to connect with the Lucy Level.

Another even lower access level was driven between 1854 and 1868 from a point just above the Smelt Mill, near the bottom of the Swart Beck, 82 fathoms (150 m) lower than the Low Level. Это был Lucy Tongue Level (often referred to as the Lucy Level)[примечание 25] which later became the main entrance to the mine until it closed in 1962. The level was driven northwards following the Lucy Tongue fault, but progress was very slow.[примечание 26] Then the miners encountered the Clay Vein, a strong barren vein with a soft clay filling, and followed it to the west. While the soft sides and fragile roof needed supporting in places with stone arches, progress was much quicker. Finally they turned north-west through solid rock, to reach the Greenside Vein 1,200 yards (1,100 m) from the entrance, and five years ahead of schedule.[88][17][80]

During the 1850s and 1860s some ore was still being won from the old levels in the top of the mountain, but the main ore-producing stopes were above and below the High and Low Levels. By the end of the 1850s the Low Level had been driven 550 yards (500 m) north of the Engine Shaft. Below it, the 36 Fathom Level was being extended in both directions. Although ore was at first very patchy in that level, stopes had been opened above it in both headings by 1858, and also a sump had gone down to 48 fathoms, where a new level was being driven.[89] A major rock fall occurred in 1862 (or 1865), known as "The Big Crush." Miners had cut away two parallel strings of lead ore above the High Horse Level, leaving an unsupported pendant of rock between them. This rock, 28 fathoms (51 m) in length and depth, and 8 to 10 fathoms (15 to 18 m) thick, fell, crushing its way down the stope to the level below, and removing the floor of Gilgower's Level above. Fortunately this happened one Sunday, when no one was in the mine.[90][85][91] In 1870 the new Lucy Tongue Level was connected to the south end of the 48 Fathom Level, by sinking a sump from above and working a rise from below. Already the new level had discovered some rich ore at the south end of the vein, and in the following years it was steadily driven north.[92][83]

Below the Lucy Tongue Level

Captain Borlase's sketch showing the Low Level Shaft and Smith's Shaft, several mine levels and the dip of the vein.

A second engine shaft (known as the Lucy Engine Shaft) was begun in 1871 from the Lucy Tongue Level, and in 1874 work began on the 20 Fathom Level (also known as No. 1 Level). A hydraulic winding engine and a water pump were installed at the top of the shaft in 1875. Over time this shaft was deepened to the 40 Fathom Level (or No. 2 Level), and in 1890 to the 60 Fathom Level. This shaft was sunk in the hard подножка rock west of the vein, and proved to be very hard work. Сжатый воздух rock drills and динамит were used for the first time at the mine. Before this, all shot holes had been bored by hand and charged with порох.[93] The 40 Fathom Level was the first to encounter the Middle Ore Shoot, where the most solid galena ever seen in the Greenside Vein was found, though at greater depths this ore shoot was variable in its quality.[15]

In 1880 the Low Level Shaft was extended to the Lucy Tongue Level. The company employed an outside contractor to do this work. Warsop and Hill used their own rock drills and the more powerful blasting gelatine. Impressed by this technology, the company installed an air compressor in 1884 and bought a number of the rock drills from the contractors. These contractors also drove the crosscut which was needed to connect the bottom of the shaft to the Lucy Tongue Level. This crosscut, 50 yards (46 m) long, was known as Warsop's Crosscut [94][17]

When Captain Borlase arrived as the chief agent (mine manager) in 1889[95] it was clear that the engine shaft in the Lucy Level had been sunk too far to the south to work the long stretch of good ore that had been found near its northern end. Also, having been sunk into the footwall, longer and longer cross-cuts were needed to reach the vein from it.[96] Another problem was that limited water resources would place limits on the winding and pumping capacities of the hydraulic engines as the mine deepened. Borlase proposed bold solutions to both problems. First he proposed building a hydroelectric power station further up the Glenridding valley, where water supply was abundant, but could not easily be used in the mine. Electricity could then be used for pumps and winding engines as well as for powering a locomotive. The electric winders and locomotive were to be the first ones installed in a metalliferous mine in Britain.[97][17] Borlase also proposed a new engine shaft 147 yards (134 m) north of the existing shaft, to be sunk initially in the hanging wall, from an eastern extension to Warsop's Crosscut. This (the third shaft at the mine) became known as Smith's Shaft, in honour of Robert Bradshaw Smith, one of the directors and the principal shareholder.[98][17][15] Smith's Shaft is about one mile (1.6 km) from the entrance to the Lucy Tongue Level.[2]

Work on the power station began in 1890. The narrow, winding Lucy Tongue Level was made ready for locomotive working during 1892, and the sinking of the new shaft began in the same year. The locomotive began work in 1893 and was able to haul all the mine’s output, replacing six horses.[примечание 27] Before this, much of the output had been taken up to the Low Level because of limited haulage capacity in the Lucy Level, but this now ceased and ore handling facilities at the entrance to the Low Level were no longer needed. The Low Level engine shaft was no longer needed, and the winding engine was removed.[99]

Over the next decade Smith's Shaft was sunk to the 40 Fathom Level, то 60 Fathom Level, and in 1899 to the 75 Fathom Level. In 1896 it was fitted with cages and an electric winding engine, and the old Lucy Engine Shaft was abandoned in 1899.[100] By 1902 all ore production from above the Lucy Level had ceased.[101] In 1904 Smith's Shaft was extended to the 90 Fathom Level which became the major working level for many years.[102] A small patch of ore above the north end of the Lucy Tongue Level was opened up in the 1890s, known as the Alma Workings. [103] Гелигнит was introduced in the 1890s, replacing both blasting gelatine and gunpowder.[104] Первый carbide lamps were introduced at Greenside from 1909 onwards; before then all work had been done by candlelight.[105]

Below the 90 Fathom Level

Smith's Shaft was 100 feet (30 m) into the footwall at the 90 Fathom Level,[2] so rather than extend it any deeper a new shaft was sunk from that level. This was an inclined shaft which followed the dip of the vein. It was sunk in 1910 from a point just north of the cross-cut at the bottom of Smith's Shaft and was known as the Skip Shaft. It was designed purely for haulage, although a ladderway was put in at the side. The skip was a large steel container with small wheels running on wooden guides. It was lowered to a chute below a working level and wagons of ore were tipped into it. It was then brought up to the 90 Fathom Level, tipped up and the ore in it dropped into other wagons to be taken along the cross-cut to Smith's Shaft.[106] В 105 Fathom Level was developed from the Skip Shaft in 1911, and in 1917–18 the shaft was deepened to the 120 Fathom Level.[107] It worked well, but there was no way to get horses down to the lower levels, so tramming had to be done by hand. So in 1916 a new cage shaft, later to be known as Murray's Shaft, was begun by extending a sump from the 90 Fathom Level, at a point 33 yards (30 m) south of the cross-cut from Smith's Shaft. This was another inclined shaft, but it was designed for winding cages so wagons, men and horses could all travel up and down it. However work ceased in 1918 while it was still 4 fathoms (7.3 m) short of the 120 Fathom Level and no further work was done on it before the company went into liquidation in 1920.[108][109]

Once the new company had been formed in 1923, Murray's Shaft was connected to the 120 Fathom Level, and then the Skip Shaft was abandoned. The 120 Fathom Level became a major production level in the mine for the next thirty years. Murray's Shaft was deepened to the 135 Fathom Level in 1924 and to the 150 Fathom Level in 1928. Production during the early 1930s came from the four new levels below the 90 Fathom Level.[110] However, Murray's Shaft had been sunk on the vein in some rich ore-bearing ground which had been stoped away. Although the shaft was supported with steel girders and timbers, and the empty stope had been backfilled with rock, it was prone to collapses, when the supports gave way and waste rock poured into it. This happened (twice) in 1931 and again in 1933, bringing production to a halt while it was repaired.[53]

One of the side-tipping wagons introduced in 1938, now positioned outside Helvellyn Greenside Youth Hostel

As soon as the Basinghall Mining Syndicate took control of the mine in 1936 urgent repair work was done on both Smith's Shaft and Murray's Shaft. The 150 Fathom Level had flooded and needed to be pumped out, and roof falls on other levels needed clearing.[111] After buying the mine in 1937 the Lucy Tongue Level was refurbished. Roof falls needed clearing and retimbering, the worst of the sharp bends were straightened out, and some narrow stone-arched sections were rebuilt. All the rails were replaced, as was the nearly fifty-year-old locomotive, and new side-tipping wagons were introduced.[112] At the same time Murray's Shaft was deepened and a new 175 Fathom Level was begun from the bottom. A small battery locomotive was installed for tramming on that level. Horses were still used on the other levels, but in time they too were replaced by battery locomotives.[113]

Murray's Shaft was deepened again to the 200 Fathom Level about 1940,[12] but that development was abandoned when it was found that the winding engine could not lift ore from that depth, and a new engine was unobtainable during the war. Instead a series of винит were sunk from various places along the 175 Fathom Level. The new company had introduced a system of coordinates to specify locations within the mine, centred on Smith's Shaft. Таким образом 940N Winze was 940 feet (290 m) north of Smith's Shaft (even though that shaft did not connect with the 175 Fathom Level.) The 940N Winze was sunk in 1939 to a new 200 Fathom Level in the heart of the rich North Ore Shoot.[114] В 1943 г. Capital Winze was sunk at 1400N and 214 Fathom sublevels were driven north and south from it. Another winze at 530S was started, but suspended when it encountered quantities of water.[115]

As the North Ore Shoot was growing richer with depth, work began in 1943 on the North Shaft, another inclined shaft for winding cages, 1,800 feet (550 m) north from the bottom of Murray's Shaft. It was while this shaft was being sunk that shales from the Skiddaw Group of rocks were first encountered at about 217 fathoms (397 m) below the Lucy Tongue Level. Soon afterwards shale also appeared in the 214 Fathom north sublevel. The fault continued in these rocks but it contained no ore. Work on the shaft was stopped and the 217 Fathom Level was developed to draw ore from the rich stopes just above the shale.[116][117][2] A short, rich section of ore south of the shale was followed down to the 237 Fathom Level, the lowest level in the mine,[14] roughly 100 m below sea level.

It was in the North Shaft that a fire occurred in 1952, which caused the greatest single loss of life in the mine's entire history. An electrical fault one weekend may have started the fire. When the men went to work on the Monday morning (7 July 1952), the air compressor was started up, and air from a broken air line fanned the flames, releasing poisonous монооксид углерода gas which began to circulate round the mine. Some of the men began to collapse when they reached the 175 Fathom Level. Four men who had descended the 940N Winze were killed, and rescuers were driven out of the mine by the gas. The bodies could not be recovered until 16 July, and the mine did not reopen until 1 September.[118][119][91]

During the 1950s the South Ore Shoot had been exhausted and workings below the 175 Fathom Level at the south end were abandoned and allowed to flood. Exploration was continued in all likely areas, from diamond drilling in the Glencoyne Level at the north end, to an extension of the 175 Fathom Level beyond the Clay Vein at the south end. Good pockets of ore were found in some places and production actually remained higher than in the mid-19th century.[120][121] In 1954 a second exit from the mine was created as an emergency escape route. This led through the Alma workings to the Low Horse Level, up an old sump into the High Horse Level, through the old brick dam and out through the Glencoyne Level. The shafts were fitted with climbing ladders, and the route was inspected weekly.[122][123]

Переработка руды

Hotching tubs used to separate galena from gangue minerals at Magpie Mine, a lead mine in Derbyshire

Three processes were involved in extracting lead from the ore brought out of the mine. First the ore had to be crushed to liberate the галенит in it from the порода минералы. Then the galena was separated from the other minerals, using some form of гравитационное разделение process, or (after 1938) a froth flotation процесс. Finally the concentrated galena was плавил in a furnace to extract the metallic lead from it.

After 1825 a horse tramway led from the High Horse Level round the edge of the marsh to a picking floor near the top of the Swart Beck. Here, pieces of waste rock were separated from ore by hand and dumped. The ore was then crushed, originally by hand using wide-headed hammers (called buckers). A crushing mill was erected in about 1827, probably using a roller crusher powered by a водяное колесо, although this still required ore to be broken by hand (known as "knocking") into pieces less than 3 inches (76 mm) in size. Water was also used to separate the galena from the gangue in hotching tubs. These worked by jigging the crushed mixed ore up and down in a tub of water; the heavier galena worked its way to the bottom of the swirling mixture and the lighter gangue to the top. There were probably no slime pits at this date, so very fine lead ore and mud in the water polluted the манить и озеро. Until 1828 the concentrated ore was taken to the High Wath smelter at Caldbeck.[124]

The Greenside smelt mill was built in 1827–28,[примечание 28] down in the Glenridding valley at the bottom of the Swart Beck, where there was a good water supply and where fuel could be brought up the valley without too much difficulty. Inside the mill there was probably a furnace to prepare the ore and a single ore hearth. The air blast was produced by мехи приводится в движение водяным колесом.[125][82] Further buildings were erected in the 1830s, to house a slag hearth furnace, and a silver refinery. There was no extended chimney: clouds of toxic lead oxides and acid sulphurous fumes would have made the valley an unhealthy place. The flue was built in 1841 to a chimney 150 m up the hillside; in 1855 it was extended to a chimney on the ridge above. Later, loops were added to increase its length. This long flue not only removed the noxious fumes, it also enabled the lead-rich dust to be recovered and returned to the smelter.[126][127] The flue was built as a stone-arched cutting, following or cut into the bedrock. This served as a giant prospecting cross-cut and proved there was no extension to the Greenside Vein to the south.[128]

Completion of the Low Horse Level in the 1840s meant that new ore dressing facilities were needed at a lower level than at the old High Mill. A new Low Mill was built near the smelt mill, with a self-acting incline to lower wagons of ore to the new mill. There it was crushed, washed, and the concentrated ore was delivered to the smelt mill. Leats from Glenridding Beck brought a plentiful supply of water to operate the machinery at the mill.[129][82] Increased ore production in the 1840s also meant that the smelting capacity had to be increased. Один отражательная печь seems to have been installed in 1844, with more in 1851. These could process much larger amounts of lead ore, but were expensive to run, consuming large amounts to coal, and needing frequent replacements of their fireclay brick linings. They were soon abandoned and a number of the simpler ore hearths were installed in 1855. Since these produced greater quantities of lead dust and fumes, the flue was extended at the same time to the new chimney.[130]

Diagram of a round buddle, with fine material being sprayed into the pit from four revolving heads

The 1853 lease required the company to reduce the pollution being washed out of its mills and down the beck. Slime pits were dug to catch the fine sands and slimes, which were then treated in a number of circular buddles. In these, water-borne fine sands were sprayed onto a sloping conical floor. Heavy lead-rich sands and muds settled near the centre of the buddle and lighter waste flowed to the edges. They helped both to increase lead recovery and reduce pollution.[131]

When the Lucy Tongue Level was completed in 1869, its entrance was below the ore hoppers at the foot of the incline from the Low Horse Level. A water-powered incline was built to take the ore up to those hoppers, though this involved a considerable amount of reorganisation in the area. Labour shortages in 1870 led to further mechanisation of the labour-intensive ore washing. A new oscillating jaw crusher eliminated the need for initial hand-knocking of the ore, and was powered by a high-pressure water turbine. Hotching tubs, even when mechanised, still needed constant supervision, and were replaced by newly-available automated fixed-sieve jigging machines. These still involved forcing water up and down through the bed of ore, but the sieves, covered with a three-inch (76 mm) layer of galena, were stationary; material of the same density passed through the bed but lighter material was washed into the next sieve down the line. They were very effective and enabled a complete separation of galena and gangue.[132]

In the 1890s, Captain Borlase's efforts to save labour costs involved improvements to the mill, making it a continuous process.[85] Ore from the mine was separated into three size fractions before crushing the larger ones. The crushed ore was passed through cylindrical троммели so that fractions of different sizes could be sent to separate jigs. Vibrating tables replaced some of the round buddles to treat fine material, and an effort was made to recover some of the zinc blende in the ore, but this seems not to have been successful. Water provided the motive power in the mill.[133][85] Smelting and refining remained labour-intensive and costly. In 1903 the decision was made to stop separating the silver and to sell argentiferous lead to a smelting company. This created an overall saving of 14 шиллинги[примечание 29] per ton of lead sold, roughly £750 per year.[134] With labour shortages during World War I and reduced ore production, it was decided to cease smelting altogether in 1917 and sell the lead concentrates.[135]

When the Basinghall Mining Syndicate took over the mine in 1936 all the old equipment in the mill was removed and a completely new electrically-powered plant was designed for high production rates. The entire output of the mine was crushed in a ball mill to the size of fine sand before being passed into a bank of froth flotation клетки. In these, organic oils and acids caused the galena particles to become attached to rising air bubbles to form a grey foam which overflowed a weir at the top. These gave a good separation: concentrates averaged 75% galena and the waste tailings only 0.2% galena. The concentrate was dried, conveyed to ore-bins and then hand-loaded onto lorries for carriage to smelting mills at Ryton near Newcastle upon Tyne.[136] However the ball mill was unable to cope with the high volumes of ore in the early 1940s. New concentrating tables were introduced. By the 1950s these processed 60% of the ore and produced concentrates of 82% galena. The remaining 40% of ore went to the ball mill and froth flotation plant.[137][138]

Транспорт

The mine was in a remote mountain valley. The lead and silver produced had to be transported out; coal, timber, explosives and other supplies had to be transported in. The number of carts travelling to and from the mine must have caused considerable damage to the roads to Penrith. To reduce this damage, the 1853 lease specified that half the carts used must have axles four inches (100 mm) longer than the other half.[139] Когда Кокермут, Кесвик и Пенрит железная дорога was opened in the 1860s, this road traffic went to Железнодорожная станция Troutbeck, saving six miles (9.7 km) each way.[83]

In 1903 the Greenside Company set up its own road haulage business. The Penrith & District Road Carrying Company was formed and operated two паровозы with several trailers.[140] One of these with its trailers was commandeered by the military authorities in 1917.[141] Новый Часовой steam wagon was bought in 1924. This had a number of accidents, and ended up falling into Glenridding Beck in 1932. There it was abandoned until a steam wagon enthusiast hauled it out and restored it in 1988. A series of petrol-driven lorries served the needs of the mine from 1928 until its closure in 1935.[142]

Water and electrical power

Water resources, dams, reservoirs and power stations at Greenside Mine

Before the mine was connected to the Национальная сеть in 1938, all operations which were not done by hand (or by horse) depended ultimately on water power. In many cases this was used directly, to power hydraulic engines, water wheels or water turbines. In other cases it was used to run an air compressor to power the rock drills, or small winding engines, and from 1890 it was used to generate electricity.

The main sources of water were Free Mosedale Beck (now known as Sticks Gill East), which ran through the upper valley beneath Green Side, and then became Swart Beck as it ran more steeply down to the lower valley of Glenridding. Glenridding Beck was the other source, fed by Red Tarn, Brown Cove and Keppelcove Tarn. Over the years a series of reservoirs were created to regulate the flow of water in these becks.

Samuel Murphy has suggested that the earliest dam was built on Swart Beck in 1827 beneath a large bowl-shaped area, where its foundations may still be seen beside the beck at an elevation of 531 m AOD. This regulated the flow of water to a water wheel used to power the bellows in the smelt mill, but when the dam burst during a violent storm in 1851 the smelt mill was destroyed.[143] It was replaced by Top Dam, built in 1851 above spoil heaps from the High Horse Level, creating a reservoir in the floor of the upper valley. This supplied water to a new and larger water wheel at the High Mill site.[144] W. T. Shaw claimed the destruction of the smelt mill happened in the 1870s when Top Dam was damaged, and that a 1,000-ounce (28 kg) plate of silver was washed away and never recovered, but no evidence has been found in the company's records of damage to the smelt mill at that date.[145][146]

The 1853 lease gave the company the right to extract water from Red Tarn and Keppelcove Tarn.[139] In the late 1860s both tarns were modified by building dams. A dam was built in 1868 to increase the capacity of Red Tarn and to regulate the beck supplying water to the Low Mill.[147] In Keppel Cove a natural tarn had formed behind a glacial морена across the floor of the valley. To draw on this water in times of low rainfall, a tunnel was made through the moraine and an 18-inch cast iron pipe laid through it to extract water from the bottom of the tarn. The top of the moraine was flattened and widened, and the work completed in 1871.[148] Catchment of the tarn was increased by diverting two streams into it, include the one out of Brown Cove[149] and at some point a dam was built to create a reservoir in Brown Cove. Its remains can still be seen, though the wall was cut down in 1936 when it was no longer needed.[150]

Foundations of Power Station No. 1 at Greenside Mine, beside the track to Red Tarn

The first hydroelectric power station was built in 1890 just below the confluence of Red Tarn Beck and Glenridding Beck. The water for this came from Keppelcove Tarn, along a leat on the lower slopes of Catstye Cam to a wooden penstock about 400 feet (120 m) above the power station. From there it was piped down to a water turbine driving a dynamo which produced a 600 volt ОКРУГ КОЛУМБИЯ поставлять. Copper cables took this to the mine, through the Low Horse Level and down the Low Level Shaft to a switchroom in Warsop's Crosscut.[151] As the mine deepened, power demands increased. In 1899 a second turbine and a 500 volt dynamo was installed in the power station. The two power lines were kept separate, but the new one followed the same route into the mine, where it seems to have been used to power an air compressor.[152] New equipment was put into the power station in 1911 to produce a 2,000 volt three–phase AC поставлять. A transformer in Warsop's Crosscut converted this to 350 volts for use in the mine, and to the 550 volt DC supply needed for the existing motors.[153]

A second power station was built in the early 1920s, using water from a small concrete dam on the Swart Beck. This produced a 2,200 volt AC supply which was taken into the mine along the Lucy Tongue Level and used to drive a new air compressor in Warsop's Crosscut, as well as a 250 volt DC supply used for the Lucy loco and the mill lights.[154]

Keppel Cove (lower right), with the breach in the wall of moraine, and the concrete dam of 1928, both visible to the left. Brown Cove is seen further up the main valley, beneath a snow-covered Helvellyn.

The dam in Keppel Cove was destroyed by a storm on 29 October 1927. After a day of heavy rain, winds increased to 90 miles per hour (140 km/h) overnight and at 1.30 am the dam gave way, emptying the tarn and sending a large flood down Glenridding Beck, through the village and into the lake. Houses were flooded and families had some narrow escapes, while the mine was left without sufficient power.[155] The old dam was abandoned and a new concrete dam was built downstream from it in 1928.[156] Yet the new dam also failed, on 20 August 1931. Its foundations were undermined after two days of heavy rain, and all the water escaped down the beck again. It was abandoned and the old Top Dam was raised to increase water storage for the mill.[157]

Meanwhile, a third power station had been built near Rattlebeck Bridge, just above Glenridding village, using water led along a leat from near the mine offices. This had a new turbine and alternator which produced a 2,200 volt three-phase AC power supply, and gave a greater generating capacity than the two earlier power stations combined.[158]

When the Basinghall Mining Syndicate took over the mine in 1936 they immediately began to cut down the dam walls at Red Tarn and in Brown Cove to make them safe, and so that they were no longer subject to legislation on dams, and a stone spillway was built beside Top Dam to provide a safe overflow channel.[150] They also decided that a reliable сети электроэнергии supply was needed at the mine. А линия электропередачи to Glenridding was installed during the winter of 1937/38. Two of the mine's power stations were refurbished so that they could supply some of the mine's requirements (up to 80% in wet weather.)[159][2]

Вопросы занятости

Mining work at Greenside (that is, driving levels, sumps and rises, and winning ore from the stopes) was done during the nineteenth century by groups of miners who formed partnerships and worked as independent contractors. Contracts (known as "bargains") for particular jobs were let once a quarter to the group bidding the lowest rate per fathom,[160] and were paid at the end of the quarter according to the amount of work that had been done. Interim payments of £2 per man (called "lent money") were made at the end of the first and second months. These were then deducted, along with the costs of candles, gunpowder and the sharpening of tools, from the payment at the end of the quarter.[161] On average each miner earned 16 to 18 shillings per week under this system.[примечание 30][162] Until 1837 the quarterly payments were made at the Angel Inn in Penrith. The whole workforce travelled into the town, and £1,600 might be paid out in cash.[163]

Ore processing was the work of independent Washing Masters, who took a bargain for a year or more to carry out a particular job, and were paid a price per ton of lead smelted. They then hired boys and young men to do the work.[162] This system lasted until 1855, when the last of the washing contracts were made. After that the company took control of the operation and paid weekly wages to the washers. Contracts continued for smelting as well as carting and smith work.[164]

Many of the men and boys who worked at the mine came from outside Patterdale, and lodged for the week either with local families or at Lodging Shops built at the mine.[165] These were simple two-storey buildings with a fireplace (for cooking and drying), tables and benches on the ground floor, and rows of double beds stacked two high on the first floor. The miners were responsible for keeping them clean, but with no floor, and no windows or ventilation upstairs, conditions in them could be very unpleasant, especially in cold wet weather or hot weather. One was built by 1832 and two more by 1839.[166] A large one built in 1859 included a reading room so that the washer boys could be given some education by the miners themselves.[167]

The men left home early on Monday morning, to arrive for a 10 o'clock start, bringing their food for the week, and returning home on Friday afternoon. The washers worked until midday on Saturday.[168] Well-graded paths on both sides of Glencoyne remain as evidence of the routes taken by the men each week. The one around the top of the valley led from Dockray and Matterdale [169] and is still known as the Miners' Balcony Path.[170] The miners usually worked a single 8–hour shift, though there was no timekeeping. The men driving the Lucy Tongue Level worked three shifts (known as "cores") so that work could continue round the clock.[167]

Health problems in miners were the result of working in poor air, filled with dust from blasting, and from dampness. Although the miners lived nearly as long as the rest of the local population, they aged more quickly. The worst affected at Greenside were those who had come from the poorly ventilated mines on Alston Moor. The smelters suffered lead poisoning from inhaling lead fumes at the furnaces.[78] The miners ran their own insurance scheme, paying a shilling a quarter[171] либо к Oddfellows Lodge (founded June 1839) or the Mechanics Lodge (founded 1869). By the 1930s these were paying 12 shillings a week to men unable to work through sickness or accident.[55]

Row of four miners' cottages at Rake Head, built in the 1860s beside the road to the mine.

A row of ten cottages for married miners was built at Seldom Seen in Glencoyne, beside the track from Penrith, about 1839;[172] these houses still exist, now used as holiday cottages. More cottages were built in Glenridding over the years: two rows of four at Low Glenridding in 1858,[173] twelve more at Rake Head in the 1860s [169] and more at High Rake in 1879 and 1881.[174] Twelve cottages known as Stybarrow Terrace were built in the village in 1890, and Halton Terrace in 1892.[175][176] Larger houses were built or bought for the mine foreman [173] and the mine agent.[177] By 1925 the company owned 52 houses.[178] There were frequent complaints about the state of the уборные;[179] only in the 1950s were the cottages finally supplied with running water and WCs were installed.[180]

By the 1880s there was a management team whose salaries were paid quarterly. The chief agent earned £200 per annum,[примечание 31] two assistant agents £115 and £100, the foreman (or timekeeper) £75 and the office clerk £37/10/0d. Mining work was still carried out under the bargain system but payments were made every four (or five) weeks. Men employed on the mine transport (filling wagons, driving horses, working at the shafts) as well as timbermen, blacksmiths and surface workers were paid wages at weekly rates.[181]

In the 1870s men were attracted away from Greenside by higher wages being paid in coal and iron mines. Average pay increased from 17 shillings to 21 shillings in 1873.[примечание 32][182] The same problem saw the loss of a fifth of the men in 1899, in spite of a 10–15% pay rise the year before.[175]

In the 1940s three 8-hour shifts were worked each day for six days a week. The miners worked on "group piece work." Each group was paid fortnightly according to the amount of work done, measured in cubic fathoms in the stopes, or in feet for driving levels or sinking winzes. The cost of explosives used, and of carbide supplied for lamps, was deducted from the payments made. Surface workers in the mill were paid weekly wages.[183] Poor labour relations at the time led to an unofficial забастовка в 1942 г .; the men on weekly rates eventually received an increase of 2 shillings per day following a similar settlement in the West Cumberland iron mines.[184]

Operation Orpheus

In 1959, when the Greenside Mine was about to close, it was used as the site of an experiment to test the сейсмический detection of large underground explosions.

В Договор о частичном запрещении ядерных испытаний of 1963 was the result of eight years of negotiations, following a proposal for a ban on nuclear tests made by the Советский союз in 1955. The biggest obstacle to a treaty was the issue of verifying that all parties complied with it, and the Western powers were determined that any agreement reached could not be violated in a clandestine manner.[185] One of the issues at stake was the possibility of disguising explosions in large underground chambers by decoupling the explosive from the rock. This idea was developed by Dr Albert Latter in 1959.[186] With negotiations underway, some small-scale tests were made immediately to determine whether decoupling could work to disguise the size of an underground explosion. After an initial pair of small explosions in clay, a larger programme of testing was undertaken, first in the Excelsior Tunnel beneath Кит Хилл in Cornwall, followed by larger explosions at a salt mine in Луизиана in the USA, and finally two explosions in solid andesite rock at Greenside Mine. The UK part of this programme was called Operation Orpheus[187][188]

The first explosion at Greenside involved the detonation of 3,010 pounds (1.37 tonnes) of TNT placed on a wooden frame in the centre of an ellipsoidal chamber 25 feet (7.6 m) long and 16 feet (4.9 m) in diameter. This was the decoupled charge. It was detonated at 22:30 on 19 December 1959, and the seismic signals were detected at six locations up to 47.5 miles (76.4 km) away. The second explosion, of 1,160 pounds (0.53 tonnes) of TNT packed into a small chamber 5 feet (1.5 m) long and 2 feet (0.61 m) in diameter, should have followed 30 minutes later. This was the smaller, coupled charge, in order to compare its seismic effects with the larger decoupled one. However the first explosion destroyed the cables and control equipment needed to detonate the second charge. The second test was further delayed by a mining accident, and eventually took place at 19:00 on 29 April 1960. But the tests were conclusive. The smaller charge gave rise to a larger seismic signal and showed that the effect of the decoupled charge was attenuated by a factor of between 10 and 30.[189][примечание 21]

Control of Greenside Mine for the tests was taken over by the United Kingdom Atomic Energy Authority at the end of November 1959. The tests were conducted by the Центр исследования атомного оружия (AWRE), but the Greenside company was contracted to carry out mining operations. Access to the mine was controlled by the police. The two explosion chambers were excavated in the 175 Fathom Level, where it had been extended south of the Clay Vein and a long crosscut had been driven in an attempt to find an extension of the Greenside Vein. This site was in solid rock, well away from the fractured and mineralised vein, and 1,700 feet (520 m) below ground level. Two drives at right angles to the crosscut were planned to lead to the chambers. The first of these was abandoned under political pressure for a quick result, and the large chamber was excavated directly at the end of the existing crosscut. Once the TNT had been placed in the two chambers they had to be sealed off with heavy stemming. Sealing the large crosscut was difficult, and there was no time to construct a large concrete plug. Sandbags filled with tailings from the mine dam were used, interspersed with air gaps and timber walls. The area was also sealed off by two brick walls so that the poisonous gases produced by the explosions could be contained and pumped out. All personnel were cleared from the mine and the explosions were detonated from the surface.[190]

After the first explosion on 19 December, re-entry to the mine was carried out by шахтное спасение teams wearing breathing apparatus, until it was established that it was safe for the AWRE men to return. They found that the stemming in the crosscut had failed to contain the blast, which had destroyed the cables and control equipment for the second charge. This was repaired and the second explosion scheduled for 15 January 1960. The evening before it was due, a group of Greenside men were finishing off some sandbagging. Two of these, who were not experienced underground workers, went off during their mid-evening break to visit a stope at the northern end of the mine, to collect pieces of white лонжерон. They failed to return, and were found dead, overcome by gases that had lingered in the stope. The test was halted while more work was done to improve the extraction of gas from the explosion. The second test finally took place on 29 April 1960. Venting the mine and checking for gases was carried out very thoroughly this time, and it was August 1960 before control of the mine was returned to the Greenside company.[191]

Underground nuclear tests were eventually excluded from the Partial Nuclear Test Ban Treaty of 1963.[185]

Closure, and after

Between August 1960 and April 1961 the last of the ore was brought out of Greenside Mine, from what was left in the stopes and from pillars and manways that were then left to collapse. 51 men and 4 staff produced the last 718 long tons (730 tonnes) of lead concentrates. About half the men were then dismissed; the other half were kept on to remove whatever equipment could be sold. Rails and pipework were removed from the working levels, and after the pumps were removed the water level slowly rose. The mill was demolished; pipes, aqueducts and power lines were removed from the surrounding hillsides. The openings of the mine were sealed. The mouth of the Glencoyne Level was walled up. The entrance to the Low Horse Level was blocked.[192] Lucy's adit was partially blocked up using a concrete seal, although there remains evidence of adit discharge.

More men were made redundant when this work had been completed in mid-December 1961. The remainder covered the spoil heaps with organic material to encourage vegetation, and demolished the old stone-walled buildings of the Smelt Mill, the Silver Refinery and the Smith's Shop. A miners' hostel was converted into a Youth Hostel. Workmen living in the many houses were helped to buy them at reduced prices. Then, on 31 January 1962 the last twelve men were paid their final wages, and the office keys were handed over to the landowners' solicitors.[72] There had been over 100 pupils at the school in Patterdale in the 1950s; after the mine closed the school roll fell to less than 20 children. Many of the houses have become holiday homes now.[119]

The old miners' school and cottages of Seldom Seen in Glencoynedale have become private housing.

Mine explorers, many with an interest in Lake District mining history, first entered the mine through the Glencoyne Level in 1977. They were able to make their way down to the Lucy Tongue Level using the long ladders of the old escape route. There had been a number of large roof-falls. One had blocked the north end of the Lucy Tongue Level, there was another at the junction with Warsop's Crosscut (although a way could be made round it), and deep water was found at the south end of the level, indicating another blockage further on.[193] Some fine photographs were taken of the old workings in 1978.[194] Attempts to enter other levels were made in 1987. Вход на Высокий Конный Уровень был расчищен, но оказалось, что он заблокирован обрушением в нескольких ярдах внутри. Также было расчищено устье Нижнего Конного Уровня, что дало доступ до Уровня Маршалла и Перекрестной Вены Джонстона, но дальнейшее продвижение было заблокировано большим количеством обрушений с крыш.[195] Одной из потенциальных опасностей для шахтеров было падение большого куска скалы в одну из шахт, ведущих к уровню Люси Языка в конце 1980-х годов. Они сделали это надежным, прикрутив болтами RSJ балку поперек ствола и крепление к ней скалы стальными тросами. Чтобы поставить балку на место, ее нужно было поднять на уровень Гленкойн и по выработкам к шахте.[196]

Открытие уровня Lucy Tongue Level было согласовано в 1993 году нынешними владельцами шахты, Специальным советом по планированию Озерного края (LDSPB), входящим в состав Управления национального парка. Группы энтузиастов совместно прорыли крышу уровня над первоначальным входом и установили большую бетонную трубу с запираемым замком. крышка люка. Они смогли пройти по уровню до «Низких арок», где он повернул на запад в Глиняную жилу. Эта мягкая жила всегда была плохим грунтом, который нуждался в опоре и кровле, и некоторые ее части обрушились. К 1996 году уровень был расчищен на 100 ярдов (91 м) через эту область.[197] В конце концов, он был полностью расчищен, мусор был собран и сложен вдоль края уровня.[198][199] В 2003 году произошло еще одно крупное обрушение на уровне языка Люси, к югу от Шахты Смита. Это потребовало еще одной крупной операции по его очистке и установке стальных опор.[198] Исследователи теперь могут проходить прямо через шахту на уровне Гленкойн и выходить с уровня Люси.[199][200]

Большая часть сайта была обозначена как запланированный древний памятник в 1979 г. Обследование останков проводилось Королевская комиссия по историческим памятникам Англии в 1991–94 гг.[201][202]

В портить кучи продолжают вызывать беспокойство. Обрушение части одного из них к западу от Сварт-Бека, выше старого участка Low Mill, в 2002 году привело к инженерному проекту стоимостью 750 000 фунтов стерлингов для стабилизации этого района.[203] Дальнейшее подробное топографическое обследование трех отвалов было проведено в июле 2014 года перед дальнейшими инженерными работами для поддержания их устойчивости.[204] Также в 2014 году Район Эдем Совет начал двенадцатимесячное экологическое исследование участка, включающее тестирование на содержание металлов в пробах почвы, травы и воды.[205]

Примечания

  1. ^ Оценка количества сырой руда извлеченные из шахты варьируются от менее 2 миллионов тонн, по данным Сирила Коннора[2] до 2,4 млн тонн,[3] до около 3 млн тонн.[4]
  2. ^ Эта порода называлась кварц-порфиром в более древней литературе, например, в Гофе.
  3. ^ Барит не был найден ниже нижнего конского уровня шахты.[4]
  4. ^ Область в Южном рудном стволе, на уровне 120 саженей, имела ширину до 40 футов (12 м) и была известна как «широкая земля».[15] Это было непосредственно над областью, где падение разлома достигало наибольшего значения 83 ° к западу.[8]
  5. ^ Ссылка на герцога Девонширского здесь может показаться ошибкой; права на добычу полезных ископаемых были заявлены герцогом Норфолком, как в документе от 1799 года.
  6. ^ Замеры горных работ раньше производились в сажень, расстояние между кончиками вытянутых пальцев мужчины.
  7. ^ Название Duke's Sump может быть отсылкой к герцогу Норфолкскому, в поместье которого он был затоплен, и которому принадлежали права на добычу полезных ископаемых.
  8. ^ Генри Ховард из Замок Грейсток, который владел поместье Гленкойндейла и Уильям Маршалл, купивший поместье Гленриддинг в 1824 году, оба утверждали, что шахта находится на их земле.[35]
  9. ^ С точки зрения покупательной способности 300 000 фунтов стерлингов в 1876 году были эквивалентны 23,2 миллиона фунтов стерлингов в ценах 2011 года.[40]
  10. ^ Что касается покупательной способности, 10,69 фунта стерлингов в 1884 году были эквивалентом 914 фунтов стерлингов в ценах 2011 года.[40]
  11. ^ Что касается покупательной способности, 25 фунтов стерлингов в 1884 году были эквивалентны 2140 фунтов стерлингов в ценах 2011 года.[40]
  12. ^ Что касается покупательной способности, то в 1889 году 61 440 фунтов стерлингов были эквивалентны 5,57 миллионам фунтов стерлингов в ценах 2011 года.[40]
  13. ^ Новая компания имела номинальную стоимость капитала 76 800 фунтов стерлингов в форме 7 980 фунтов стерлингов 10 акций, зачисленных на счет 8 фунтов стерлингов, что ограничивало обязательства акционеров невыплаченными 2 фунтами стерлингов за акцию.
  14. ^ Капитан Уильям Генри Борлас был из Корнуолл и он продолжал использовать корнуоллский титул «Капитан шахты» на протяжении всей своей жизни.
  15. ^ Новыми землевладельцами в 1919 году были мистер У. Х. Маршалл и леди Мейбл Ховард.
  16. ^ На новые обыкновенные акции было зачислено 16шиллинги оплачены (20 шиллингов были эквивалентны 1 фунту стерлингов), в результате чего акционеры несли ответственность за требования до 4 шиллингов за акцию. Этих акций на сумму 24 576 фунтов стерлингов было более чем достаточно для покупки рудника с его зданиями, оборудованием и оборудованием у ликвидаторов (по цене 19 968 фунтов стерлингов). На 4 280 привилегированных акций было внесено 5 шиллингов.
  17. ^ Горнодобывающий синдикат Басингхолла был назван в честь Basinghall Street в Лондонский Сити, где его юридический адрес был расположен.
  18. ^ Кредиторам старой компании были выплачены выплаты в полном объеме, держатели рискованных привилегированных акций получили 10 шиллингов за акцию, а держатели обыкновенных акций получили 1 шиллинг за акцию.
  19. ^ Что касается покупательной способности, 30 шиллингов в 1942 году были эквивалентны 57,40 фунта стерлингов в ценах 2011 года.[40]
  20. ^ Что касается покупательной способности, 19 926 фунтов стерлингов в 1946 году были эквивалентны 678 000 фунтов стерлингов в ценах 2011 года.[40]
  21. ^ а б Глава Мерфи об операции «Орфей» также доступна в Patterdale Today.[70] и Subterranea Britannica [71] веб-сайты.
  22. ^ Высокий уровень лошади часто известен как высокий уровень. Когда на нем впервые начали ездить, он, по-видимому, был известен просто как уровень лошади, поскольку в то время не было более низкого уровня.[74]
  23. ^ Что касается нынешних затрат, 2500 фунтов стерлингов в 1835 году были эквивалентны 265000 фунтов стерлингов в ценах 2011 года.[40]
  24. ^ Вал был назван валом Вилли, потому что Уильям Гленрайт был первым водителем, который работал с этими двигателями.[83]
  25. ^ Уровень языка Люси был назван в честь разлома языка Люси, который пролегал с севера на юг через Язык Люси, язык земли на Шеффилд Пайк между Сварт-Беком и безымянным ручьем на востоке. Новый уровень последовал за более легким грунтом этого разлома на север до мягкой глиняной жилы с востока на запад.
  26. ^ К 1864 году он прошел 800 ярдов (730 м), в среднем всего 76 ярдов (69 м) в год и отставал от графика более чем на пять лет.
  27. ^ Лошади по-прежнему использовались на нижних уровнях рудника, чтобы доставлять руду от забоя к шахте.[96]
  28. ^ Стоимость постройки плавильного завода составила 340 фунтов стерлингов, оплаченных землевладельцами, которые компания выплатила с процентами из расчета 17 фунтов стерлингов в год. Что касается нынешних затрат, 340 фунтов стерлингов в 1828 году были эквивалентны 31 600 фунтам стерлингов в ценах 2011 года.[40]
  29. ^ С точки зрения сегодняшних затрат, 14 шиллингов в 1903 году были эквивалентны 72,70 фунтов стерлингов в ценах 2011 года.[40]
  30. ^ Средний годовой номинальный доход в 1835 году составлял 32,12 фунта стерлингов. 18 шиллингов в неделю равняются 46,80 фунта стерлингов в год, что намного выше среднего показателя по стране, хотя его покупательная способность была эквивалентна 72,70 фунта стерлингов в ценах 2011 года с использованием Индекс розничных цен.[40]
  31. ^ 200 фунтов стерлингов в 1880 году почти в четыре раза превышали среднегодовой номинальный доход в том году (который составлял 55,89 фунтов стерлингов). Его покупательная способность была эквивалентна 16 300 фунтов стерлингов в ценах 2011 года с использованием Индекс розничных цен.[40]
  32. ^ 21 шиллинг в 1873 году имел покупательную способность 76,30 фунта стерлингов в ценах 2011 года.[40]

Рекомендации

  1. ^ Мерфи 1996, п. 464.
  2. ^ а б c d е ж грамм час Коннор 1951a.
  3. ^ Гоф 1965, п. 1461.
  4. ^ а б c Шоу 1975, п. 82.
  5. ^ Мерфи 1996, п. iv.
  6. ^ а б Британская геологическая служба, лист E029.
  7. ^ а б Гоф 1965, п. 1465.
  8. ^ а б c Гоф 1965, п. 1473.
  9. ^ Stone et al. 2010 г., п. 195.
  10. ^ а б c d е ж Гоф 1965, п. 1467.
  11. ^ а б Постлтуэйт 1913, п. 122.
  12. ^ а б c d е Шоу 1975, п. 85.
  13. ^ Гоф 1965, п. 1468.
  14. ^ а б c Шоу 1975, п. 88.
  15. ^ а б c Шоу 1975, п. 87.
  16. ^ Мерфи 1996, п. 399.
  17. ^ а б c d е ж грамм час Постлтуэйт 1913, п. 123.
  18. ^ Адамс 1995, п. 136.
  19. ^ Мерфи 1996, п. 2.
  20. ^ Мерфи 1996, п. 3.
  21. ^ Кларк 1787.
  22. ^ а б c Шоу 1975, п. 77.
  23. ^ Гоф 1965, п. 1460.
  24. ^ Мерфи 1996, п. 8.
  25. ^ Зеленый 1819.
  26. ^ а б c Мерфи 1996, п. 10.
  27. ^ Мерфи 1996, п. 9.
  28. ^ а б Мерфи 1996, п. 11.
  29. ^ Мерфи 1996 С. 10–12.
  30. ^ Артиллерийское управление 1861 г..
  31. ^ Мерфи 1996 С. 12–14.
  32. ^ Мерфи 1996, п. 12.
  33. ^ Мерфи 1996, п. 15.
  34. ^ Мерфи 1996 С. 18, 50.
  35. ^ Мерфи 1996, п. 16.
  36. ^ Мерфи 1996 С. 16–18.
  37. ^ Мерфи 1996 С. 33–37.
  38. ^ Мерфи 1996 С. 50–53.
  39. ^ Мерфи 1996 С. 78–79, 100.
  40. ^ а б c d е ж грамм час я j k л Стоимость измерения.
  41. ^ Постлтуэйт 1913, п. 126.
  42. ^ Мерфи 1996 С. 163–165, 181.
  43. ^ Мерфи 1996 С. 163–165, 182.
  44. ^ Мерфи 1996 С. 180–181.
  45. ^ Мерфи 1996, стр. 182–3, 188.
  46. ^ Мерфи 1996 С. 226–227.
  47. ^ Мерфи 1996 С. 243, 257.
  48. ^ Мерфи 1996 С. 257–259.
  49. ^ Мерфи 1996 С. 260–265.
  50. ^ Мерфи 1996, п. 267.
  51. ^ Мерфи 1996 С. 296–301.
  52. ^ Мерфи 1996 С. 302–306, 312.
  53. ^ а б Мерфи 1996 С. 316, 325.
  54. ^ Мерфи 1996 С. 315, 318.
  55. ^ а б Мерфи 1996, п. 323.
  56. ^ Мерфи 1996 С. 325–328.
  57. ^ Мерфи 1996 С. 331–334.
  58. ^ Мерфи 1996 С. 335–341.
  59. ^ Мерфи 1996, п. 342.
  60. ^ Мерфи 1996 С. 364–366.
  61. ^ Мерфи 1996 С. 368–372.
  62. ^ Мерфи 1996 С. 391, 401.
  63. ^ Мерфи 1996 С. 376, 380.
  64. ^ Мерфи 1996 С. 392–393.
  65. ^ Мерфи 1996 С. 393–394.
  66. ^ Мерфи 1996 С. 398–400.
  67. ^ Мерфи 1996, п. 411.
  68. ^ Мерфи 1996 С. 437–438.
  69. ^ Мерфи 1996 С. 439–453.
  70. ^ Паттердейл сегодня 2008.
  71. ^ Subterranea Britannica 2004.
  72. ^ а б Мерфи 1996 С. 453–457.
  73. ^ Мерфи 1996, стр. 20, 23–24.
  74. ^ Мерфи 1996, п. 24.
  75. ^ Мерфи 1996, стр. 12, 23–25, 33, 55.
  76. ^ Мерфи 1996 С. 52–55.
  77. ^ Шоу 1975, п. 85, 86.
  78. ^ а б Мерфи 1996 С. 114–115.
  79. ^ Мерфи 1996 С. 55–57.
  80. ^ а б Шоу 1975, п. 86.
  81. ^ Мерфи 1996 С. 72–78.
  82. ^ а б c Шоу 1975, п. 78.
  83. ^ а б c Шоу 1975, п. 80.
  84. ^ Мерфи 1996 С. 76–77.
  85. ^ а б c d Постлтуэйт 1913, п. 125.
  86. ^ Шоу 1975 С. 78–80.
  87. ^ Мерфи 1996 С. 89–90.
  88. ^ Мерфи 1996 С. 81–83.
  89. ^ Мерфи 1996 С. 86–89.
  90. ^ Мерфи 1996 С. 91, 92.
  91. ^ а б Шоу 1975, п. 81.
  92. ^ Мерфи 1996 С. 122–124.
  93. ^ Мерфи 1996 С. 125–131.
  94. ^ Мерфи 1996 С. 166–170.
  95. ^ Мерфи 1996, п. 183.
  96. ^ а б Мерфи 1996, п. 197.
  97. ^ Мерфи 1996 С. 188–192.
  98. ^ Мерфи 1996 С. 197–198.
  99. ^ Мерфи 1996 С. 192–197.
  100. ^ Мерфи 1996 С. 203–204.
  101. ^ Мерфи 1996, п. 228.
  102. ^ Мерфи 1996, п. 230.
  103. ^ Мерфи 1996, п. 202.
  104. ^ Мерфи 1996, п. 204.
  105. ^ Мерфи 1996, п. 240.
  106. ^ Мерфи 1996, п. 237.
  107. ^ Мерфи 1996 С. 244–245.
  108. ^ Мерфи 1996 С. 245, 268.
  109. ^ Шоу 1975, п. 85, 87.
  110. ^ Мерфи 1996, стр. 268–269, 314–315.
  111. ^ Мерфи 1996, п. 337.
  112. ^ Мерфи 1996 С. 350–352, 365.
  113. ^ Мерфи 1996 С. 364–365.
  114. ^ Мерфи 1996, п. 373.
  115. ^ Мерфи 1996 С. 373, 379.
  116. ^ Мерфи 1996, стр. 377–379, 392–393.
  117. ^ Шоу 1975, п. 81, 88.
  118. ^ Мерфи 1996 С. 425–431.
  119. ^ а б Джексон 2013.
  120. ^ Мерфи 1996, стр. 407–412, 436–437.
  121. ^ Коннор 1955.
  122. ^ Мерфи 1996, п. 433.
  123. ^ Шоу 1975, п. 89.
  124. ^ Мерфи 1996, стр. 25–28, 57–58.
  125. ^ Мерфи 1996, стр. 28–30, 59.
  126. ^ Мерфи 1996 С. 59–64, 107, 147–148.
  127. ^ Постлтуэйт 1913 С. 125–126.
  128. ^ Шоу 1975 С. 78, 82.
  129. ^ Мерфи 1996 С. 66–69.
  130. ^ Мерфи 1996 С. 101–107.
  131. ^ Мерфи 1996 С. 97–99.
  132. ^ Мерфи 1996 С. 135–144.
  133. ^ Мерфи 1996 С. 205–222.
  134. ^ Мерфи 1996 С. 248–249.
  135. ^ Мерфи 1996 С. 255–256.
  136. ^ Мерфи 1996 С. 355–364, 371.
  137. ^ Мерфи 1996 С. 380–385.
  138. ^ Коннор 1951b.
  139. ^ а б Мерфи 1996, п. 79.
  140. ^ Мерфи 1996 С. 232–236.
  141. ^ Мерфи 1996, п. 246.
  142. ^ Мерфи 1996 С. 319–323.
  143. ^ Мерфи 1996 С. 69–71.
  144. ^ Мерфи 1996 С. 92–93.
  145. ^ Шоу 1975 С. 80–81.
  146. ^ Мерфи 1996, п. 71.
  147. ^ Мерфи 1996, п. 101.
  148. ^ Мерфи 1996 С. 136–137.
  149. ^ Мерфи 1996, п. 295.
  150. ^ а б Мерфи 1996, п. 349.
  151. ^ Мерфи 1996 С. 189–191.
  152. ^ Мерфи 1996 С. 223–225.
  153. ^ Мерфи 1996, п. 241.
  154. ^ Мерфи 1996 С. 275–277.
  155. ^ Мерфи 1996 С. 296–300.
  156. ^ Мерфи 1996 С. 302–306.
  157. ^ Мерфи 1996, стр. 312–313.
  158. ^ Мерфи 1996 С. 306–308.
  159. ^ Мерфи 1996 С. 342–344.
  160. ^ Мерфи 1996, п. 45.
  161. ^ Мерфи 1996, п. 49.
  162. ^ а б Мерфи 1996, п. 46.
  163. ^ Мерфи 1996 С. 49–50.
  164. ^ Мерфи 1996, п. 108.
  165. ^ Мерфи 1996, п. 38.
  166. ^ Мерфи 1996, п. 39.
  167. ^ а б Мерфи 1996, п. 113.
  168. ^ Мерфи 1996 С. 40–41.
  169. ^ а б Мерфи 1996, п. 119.
  170. ^ Ричардс 2008, п. 139.
  171. ^ Мерфи 1996, п. 116.
  172. ^ Мерфи 1996, п. 40.
  173. ^ а б Мерфи 1996, п. 117.
  174. ^ Мерфи 1996, п. 157.
  175. ^ а б Мерфи 1996, п. 184.
  176. ^ Шоу 1975 С. 77–78.
  177. ^ Мерфи 1996 С. 120, 186.
  178. ^ Мерфи 1996, п. 272.
  179. ^ Мерфи 1996 С. 227, 272.
  180. ^ Мерфи 1996 С. 434–435.
  181. ^ Мерфи 1996 С. 172–174.
  182. ^ Мерфи 1996, п. 133.
  183. ^ Мерфи 1996 С. 369–370.
  184. ^ Мерфи 1996, п. 390.
  185. ^ а б Государственный департамент США, 2004 г..
  186. ^ Лейт 2001, п. 4.
  187. ^ Западный британец 2009.
  188. ^ Мерфи 1995, п. 440.
  189. ^ Мерфи 1995 С. 441–447, 451.
  190. ^ Мерфи 1996 С. 441–444.
  191. ^ Мерфи 1996 С. 448–453.
  192. ^ Мерфи 1996, п. 453.
  193. ^ Мерфи 1996, п. 458.
  194. ^ AditNow, Архивный альбом.
  195. ^ Мерфи 1996 С. 458–459.
  196. ^ AditNow, RSJ Haul.
  197. ^ Мерфи 1996, п. 459.
  198. ^ а б CATMHS, Достижения.
  199. ^ а б Mine Explorer 2009.
  200. ^ Зал 2013.
  201. ^ Мерфи 1996, п. 460.
  202. ^ Прошлый год 2007.
  203. ^ Cumberland & Westmorland Herald 2002.
  204. ^ Шофилд 2014.
  205. ^ Районный совет Эдема 2014.

Источники

внешняя ссылка